Keep your rules.
Add what comes next.
Retain site rules and safety limits while adding forecasts of load and response impacts. Evaluate conditions now and the state likely to follow an action.
Operations based on fixed thresholds, schedules and runbooks
| Dimension | Rule-based approach | With QUNIA | Value for the operator |
|---|---|---|---|
| Decision timing | Respond when defined conditions or scheduled times are reached | Assess response timing against future load and risk ranges | +Gain an opportunity to prepare before a threshold is reached |
| Operating context | Follow branches defined by inputs and exception rules | Forecast workloads, power, cooling and storage together | +Account for different conditions behind the same threshold |
| Response selection | Apply the action or runbook linked to the trigger | Compare expected effects and constraints across multiple options | +Review options suited to the current situation |
| Operational control | Control actions through configured permissions, interlocks and rules | Define predictive recommendations and approval scope within existing safety limits | +Extend decision support while retaining site control |
Scope: this comparison covers representative uses of each tool and QUNIA's intended added value. Individual products may also offer forecasting or optimization. Benefits are design goals, not verified performance claims; available features and impact must be assessed in a site PoC.
Two situations reach the same power threshold
Review the response procedure assigned to the trigger.
Distinguish a load that is about to fall from one that will keep rising, then assess whether action is needed and the impact of each option.
Unnecessary actions, response lead time, constraint violations and alignment with operator judgment
Compare both approaches using the same data, time period and operating constraints.